Interactive Project Map

The interactive map below links to visual simulations of how the Section 80 transmission line is viewed prior to construction and what we anticipate it will look like after the new line and structures are installed. CMP selected several locations with high visibility or significance to demonstrate what area residents may expect to see once the project is completed. Please note: In the "new" images, vegetation maintenance (plants and trees) is estimated and may be adjusted in the field based on actual conditions and forestry standards.

To use: Select the location. Then select regular or panoramic to view a pdf with side-by-side images.

 



Get in touch

For more information about CMP’s Section 80 transmission line rebuild, please contact Public Outreach

T: 888-267-0831
E: [email protected]

Ask a question?

Name is a required field
Email is a required field
Street Address is a required field
Question is a required field