Construction Info

Planned Pole Placements in Right of Way (Drawings)

A cross-section of the corridor, looking south, of where Section 49 34.5kV line and Section 80 115kV line are located now in CMP’s 150-foot right of way and where the new line will be constructed. Distances are measured in feet.

A cross-section of the corridor, looking south, of where CMP’s Section 80 115kV line is located now in our 150-foot right of way and where the new line will be constructed. Distances are measured in feet.

Get in touch

For more information about CMP’s Section 80 transmission line rebuild, please contact Public Outreach

T: 888-267-0831
E: [email protected]

Ask a question?

Name is a required field
Email is a required field
Street Address is a required field
Question is a required field